DECEMBER 2011 - Workers installed tennis screen material on fencing surrounding equipment storage on Kanan Road to minimize visual impact. |
|
|
|
|
|
|
|
|
|
|
|
|
Workers constructed rebar around the tank inlet and outlet pipes prior to encasing them in concrete. |
|
|
|
|
|
|
|
|
|
|
|
|
The trench was then filled with concrete, leaving the tops of the pipes exposed for connection to the tank floor. |
|
|
|
|
|
|
|
|
|
|
|
|
Industrial-strength plastic was laid out on the floor of the reservoir site to serve as a moisture barrier |
|
|
|
|
|
|
|
|
|
|
|
|
A perimeter pipeline was installed to convey water into a drainage canal in the unlikely event of a leak. |
|
|
|
|
|
|
|
|
|
|
|
|
Workers took delivery of pipeline that will connect the new reservoir to existing water main along Kanan Road. |
|
|
|
|
|
|
|
|